65% polyester/35% cotton, PU coating, 245g/m2
polyester padding, 80g/m2
- undetachable hood with drawstring
- chest pockets
- side pockets
- elastic cuff
- adjustable hem with drawstring
- produced in our China factory
- lead time: 3 months for initial order and 2.5 months for repeat orders.
没有评论:
发表评论